SERVICES

BALLAST WATER TREATMENT SYSTEM

Having in mind that IMO Ballast Water Management Convention on 8 September 2017 forced substantial number of vessels are required to install Ballast water Management system.

Freya Marine is well-prepared on this demand , our ex Ship Repair manager supervisors are fully capable to handle the project from detailed engineering study , 3D scanning and feasibility works , Supply chain (supplying of pipe and outfitting material , valves , electrical cabling) , manufacturing process based on isometric drawings and Technical plans and installation on board by offering cost-effectively method and optimum time saving.

We are offering all BWTS related valves , electrical cables , connections , transformers with fast delivery time and best price.

With our experienced team which has Seaman boks , we are able to complete full installation within optimum time.